openFDA Device Enforcement
Report-date coverage
June 20, 2012–July 08, 2026
Known gap: openFDA describes 2004-present coverage, but the current export has no report-date records in this interval.
openFDA Device Recall
event_date_initiated coverage
June 01, 1997–June 30, 2026
Enforcement coverage uses report dates; product initiation dates can precede those bounds. Device-enrichment coverage uses FDA event_date_initiated.
Product dates, classifications, firms, and source wording remain attached to their individual rows.
Opening this dossier never hides products that did not match a prior timeline filter.
device · product 1 of 1
iSED Primary Pump Tubing Spare Part Kit- (IVD) tubing is used to move sample and wash solution from the aspiration needle, through the reading chamber, and to the waste on the iSED Automated ESR Analyzer PN: 112-13-002
Primary Pump Tubing Spare Part is incorrect. If the tubing is installed onto an ALCOR iSED ESR Analyzer, there is a potential of a biohazard leak from the iSEDs Probe Tube
These labels are deterministic app interpretations, not FDA categories.
Primary Pump Tubing Spare Part is incorrect. If the tubing is installed onto an ALCOR iSED ESR Analyzer, there is a potential of a biohazard leak from the iSEDs Probe Tube
Code information
Lot 4/22
Distribution pattern
US Nationwide Distribution - FL, MA, MD, PA, SD, WI Foreign: Croatia Honduras Korea