Skip to content
Recall Observatory FDA recall evidence

Device product

Acetabular Pressurizer; single use and six units per box. The Acetabular Pressurizer 0206-522-000 is an accessory to the Advanced Cement Mixer (ACM). The Acetabular Pressurizer Tiplet P/N 0206-522-012 is sealed in a two pouches, sterilized, and labeled as part number 0206-522-000. This Acetabular Pressurizer is an accessory used to pressurize the cement applied to the prosthesis to be implanted during the surgery. The Acetabular Pressurizer is an injection molded component made with resin material DOW HDPD 10462N which is a rigid plastic once it is molded.

Z-0280-2014

November 01, 2013

Class II

Product summary

Firm
Stryker Instruments Div. of Stryker Corporation
Event
Event 66444
Status
Terminated
Classification
Class II
Quantity
87 boxes (522 each)
Official record key
device-enforcement:Z-0280-2014

Official wording

Reason: On March 14, 2013 a Work Order was opened for 120 units (20 boxes) of the Acetabular Pressurizer (P/N 0206-522-000 Rev. H). On March 15, 2013, when the product was going to be placed in the pouch to be sealed, the manufacturing operator noticed that some assemblies were cracked. As a result of the injection pressure of the cement gun, a cracked tiplet may release from the Hub during cement applica

Code information: Part number: 0206-522-000 and lots: 08183012, 08310012, 09237012, 10243012, 11109012, 11353012, and 12216012

Distribution pattern: Worldwide distribution: US (nationwide) including states of: TX, FL, IL, IA, ND, WI, VA, and NJ.; and countries of: CANADA, POLAND and SWITZERLAND.

Derived failure modes

  • Unknown

    reason.no_named_rule · v1.0.0

    On March 14, 2013 a Work Order was opened for 120 units (20 boxes) of the Acetabular Pressurizer (P/N 0206-522-000 Rev. H). On March 15, 2013, when the product was going to be placed in the pouch to be sealed, the manufacturing operator noticed that some assemblies were cracked. As a result of the injection pressure of the cement gun, a cracked tiplet may release from the Hub during cement applica